Tacked up Ran 1/4″ flat bar on the firebox opening Welded most of it out just no pictures
3rd Revision of drawings – my first edits to the drawing we’re unclear to the engineer
Charcoal Basket with large opening to produce charcoal
Pan will be made for ash and charcoal to be dropped down Bin slides out for easy removal
Base for the main chamber and firebox – 4″ Casters will be mounted
Main Chamber tacked up, the charcoal drawer has been cut out with a plasma torch When I wrote down my cut list I missed the top of the chamber. Oh well! Squaring up the main chamber by using the sides pieces, I trim the angles using a plasma torch and grinding the fit perfectly. Stitch seams in place
Sorry for the delay, Christmas and time off was required. Here’s the latest updated photos
Adjustable grate will actually drop into the tuning plate brackets I’m having issues with way the cabling rolls up. I’m getting jamming in the cable Temp wheel worked out well Countertop slowly coming One heavy basket!