Marking out and torching the ash dump, this allows the ash to be removed from the bottom of the firepit. I disposable roasting pan work the best. Finding center of the front panels to torch out air intake circles using a
circle maker and the plasma torch.Zipped out 3 – 3″ circles for the air intake Must have missed a few photos of the tacked up pit. All seams are fully welded. Next legs and then the hood will go on. The ash bin will have expanded metal welded to the bottom and the insert will be trimmed out, this will hold it in place. A log rack will be mounted on
top of the ash bin insertRan the weld a little hot today Wire wheel will clean this up nice. Getting ready for legs! Legs installed and welded in place, 4″ squared 3/16th steel feet still
needs to be zapped in placeSits level and squared to the table Clean up on the metal still hours away top shot