Done right view left view 1st burn stones installed stones made it solid firebox for the smoker used copper sulphate to patina the metal patina turned out great grease and rain water drain smoker air intake seasoning the metal
Well it was a task to pin that massive pit to the fire storage box! We ended up using a CASE 200 Excavator with a 38ft reach! Thank You Dustin and Josh (Jordan)(Jesse)(Justin) and of course Tom the owner of the Pit. Only wish I video of the install. It only took about 5 minutes from start to finish, strapping in the pit to lifting the 780lb chunk of metal. The upper unit sliding right into the support rails and soon after Tom and Coreen had large rocks and stones covering the bottom of the unit and surrounding the fire storage box.
We’re actually expanding the pit. Clay oven! That’ s right a clay oven for pizza’s and bread’s