Sheridan Build Installed

Well it was a task to pin that massive pit to the fire storage box! We ended up using a CASE 200 Excavator with a 38ft reach! Thank You Dustin and Josh (Jordan)(Jesse)(Justin) and of course Tom the owner of the Pit. Only wish I video of the install. It only took about 5 minutes from start to finish, strapping in the pit to lifting the 780lb chunk of metal. The upper unit sliding right into the support rails and soon after Tom and Coreen had large rocks and stones covering the bottom of the unit and surrounding the fire storage box.

Test Burn 1 of several to test the welds, not one popped!

We’re actually expanding the pit. Clay oven! That’ s right a clay oven for pizza’s and bread’s